Which Circle is Correct?
While Engineer Team reviewing Engineering submission of Elevator(s) to select one of robust brands, The Contractor unable to identify the lift-pit base during the site readiness to cast the Raft, RE or/and PM missing to recognize it.
Yes its a Problem in RIP Scale, as RE or/and PM unknown the impact of finalize the Engineering works of lifts prior related pit excavation and bad news reach to their top management level.